Thursday, October 25, 2012

Layers of foundation


 
  
Filling in the electrical/phone conduit and well pipe/conduit ditches.
    


The wood frames have been removed from the footings; you can see the concrete edge and the (dirty) foam alongside and below it. The black stuff is capillary break, which keeps water from seeping up into the walls. And the footing drains are in between the footings and the dirt wall. Tomorrow we get more rebar for the next layer of foundation.

No comments:

Post a Comment