Tuesday, December 11, 2012

Pour the floor

Yesterday they were pouring the concrete for the downstairs floor. Here they're working in the boys' bedrooms.

The ecofoam is glued firmly in place, with perf board (not really a board) covering it and more waiting to be applied.
Perf is draped over the waterproofing and ecofoam. The tarps on top are to minimize leakage into the structure, where the concrete floor is being poured.

No comments:

Post a Comment