Monday, November 12, 2012

Now THAT's a wall!


The forms are coming off and we have real walls! More specifically, 59 cubic yards worth of concrete in the walls. Next up, vapor barrier will be applied to the exterior of the wall (the same capillary block that was used between the footings and the walls), then foam, then dimple board. Eventually, after some of the framing and the upper deck is in place, dirt can be backfilled into the gap between the hill and the wall.